I 290 WB over HWY COLBY AV

.3 MI.STH.OF LINCOLN ST. · County 027, Massachusetts · Built 1967 · 3 Lanes · 44,117 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
W441131TLDOTNBI
Year Built
1967
Length
28 m (91.9 ft)
Max Span
26.5 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
44,117
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,220,000
Total Project Cost
$1,831,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.