I 290 RAMP C over I 290 & MILLBROOK ST

.25 MI W OF BURNCOAT ST · County 027, Massachusetts · Built 1962 · 2 Lanes · 13,309 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W441011TGDOTNBI
Year Built
1962
Reconstructed
1982
Length
114 m (374 ft)
Max Span
31.8 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
13,309
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,093,000
Total Project Cost
$10,640,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.