I 290 RAMP A over I 290 /MILLBROOK/RAMP C

290EB EX 22 .25 W BURNCO · County 027, Massachusetts · Built 1962 · 2 Lanes · 28,076 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W441001KHDOTNBI
Year Built
1962
Reconstructed
1982
Length
225.9 m (741.1 ft)
Max Span
45.4 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
28,076
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,101,000
Total Project Cost
$30,152,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.