I 290 over HWY SEYMOUR ST

.2 MI WEST OF ST 122A · County 027, Massachusetts · Built 1959 · 8 Lanes · 126,972 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W440871T6DOTNBI
Year Built
1959
Length
13.7 m (44.9 ft)
Max Span
12.2 m
Width
38.7 m (127 ft)
Lanes
8
Daily Traffic
126,972
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$704,000
Total Project Cost
$1,057,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.