ST 12 W BOYLSTN ST over RR BMRR

50 FT N OF EAST MOUNTAIN · County 027, Massachusetts · Built 1927 · 4 Lanes · 11,407 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W44028236DOT634
Year Built
1927
Reconstructed
1986
Length
23.8 m (78.1 ft)
Max Span
22.6 m
Width
24 m (78.7 ft)
Lanes
4
Daily Traffic
11,407
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,740,000
Total Project Cost
$5,611,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.