ST 12 SPRING ST over WATER MILLERS RIVER

1.5 MI E OF ST 140 · County 027, Massachusetts · Built 1937 · 2 Lanes · 6,724 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
W39020196DOTNBI
Year Built
1937
Reconstructed
1991
Length
11.3 m (37.1 ft)
Max Span
10.2 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
6,724
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$767,000
Total Project Cost
$1,151,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.