HWY N ROYLSTN RD over WATER TARBELL BROOK

1.5M W OF RT12 BULLARDVLL · County 027, Massachusetts · Built 2019 · 2 Lanes · 1,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W39015BQGMUNNBI
Year Built
2019
Length
17.1 m (56.1 ft)
Max Span
15.8 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.