HWY RIVER ST over WATER MILLERS RIVER

1.5 MI E ROYALSTON · County 027, Massachusetts · Built 1958 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
W3900516EMUNNBI
Year Built
1958
Length
13.7 m (44.9 ft)
Max Span
13.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$773,000
Total Project Cost
$1,160,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.