HWY BELDEN ST over WATER HEMLOCK BROOK

0.1M NORTH OF MAIN ST. · County 003, Massachusetts · Built 1992 · 1 Lanes · 388 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
W3702408WMUNNBI
Year Built
1992
Length
11 m (36.1 ft)
Max Span
11 m
Width
6.4 m (21 ft)
Lanes
1
Daily Traffic
388
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,948,000
Total Project Cost
$2,923,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.