ST 2 MAIN ST over WATER GREEN RIVER

.1 MI EAST OF COLE AVE · County 003, Massachusetts · Built 2024 · 2 Lanes · 12,280 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
W37015C4RDOTNBI
Year Built
2024
Length
39.2 m (128.6 ft)
Max Span
17.6 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
12,280
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.