HWY VILLAGE HILL over WATER W BR MILL RIVER

125 E OF INT W/ ROUTE 9 · County 015, Massachusetts · Built 1999 · 2 Lanes · 786 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W36028AF6MUNNBI
Year Built
1999
Length
16.2 m (53.1 ft)
Max Span
14.8 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
786
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,643,000
Total Project Cost
$2,465,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.