HWY NORTH ST over WATER W BR MILL RIVER

230 N OF RTE 9 AT N MAIN · County 015, Massachusetts · Built 1913 · 2 Lanes · 2,365 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
W360060FFMUNNBI
Year Built
1913
Length
12.8 m (42 ft)
Max Span
11.3 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
2,365
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$904,000
Total Project Cost
$1,357,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.