ST116 over RR GWRR

0.1 MI E OF US 5 & ST 10 · County 011, Massachusetts · Built 1968 · 2 Lanes · 16,096 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
W330220VLDOTNBI
Year Built
1968
Length
37.1 m (121.7 ft)
Max Span
13.8 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
16,096
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,701,000
Total Project Cost
$5,552,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.