HWY MAIN ST over RR GWRR

.3 MI E JCT ST5 & N MN · County 011, Massachusetts · Built 1903 · 2 Lanes · 4,008 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
D0600413XDOT634
Year Built
1903
Reconstructed
1946
Length
10.7 m (35.1 ft)
Max Span
9.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
4,008
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,338,000
Total Project Cost
$3,508,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.