ST 88 over WATER WESTPORT RIVER

.8 MI S OF DRIFT RD. · County 005, Massachusetts · Built 1958 · 4 Lanes · 7,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W300163W6DOTNBI
Year Built
1958
Reconstructed
2004
Length
312.4 m (1024.9 ft)
Max Span
22.9 m
Width
21.9 m (71.9 ft)
Lanes
4
Daily Traffic
7,600
Material
Steel
Design
Movable - Bascule
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$44,501,000
Total Project Cost
$66,752,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.