HWY FORGE RD over WATER E BR WESTPORT RIV

.3 MI S OF RTE 177 · County 005, Massachusetts · Built 1938 · 2 Lanes · 1,422 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W300043M3MUNNBI
Year Built
1938
Reconstructed
1967
Length
13.4 m (44 ft)
Max Span
12.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
1,422
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$773,000
Total Project Cost
$1,160,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.