HWY NORTH RD over WATER ROBERTS MEADOW BRK

575 W CHESTERFIELD RD · County 015, Massachusetts · Built 2014 · 2 Lanes · 1,164 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
W27015BD7MUNNBI
Year Built
2014
Length
15.1 m (49.5 ft)
Max Span
14 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
1,164
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,521,000
Total Project Cost
$2,282,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.