HWY KINGS HWY over WATER N BR MANHAN RIVER

W OF JCT RESERVOIR RD · County 015, Massachusetts · Built 2022 · 2 Lanes · 300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
W27005C48MUNNBI
Year Built
2022
Length
18.4 m (60.4 ft)
Max Span
17.6 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
300
Material
Prestressed Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.