HWY BAKER ST over I 90 WB

.2 MI N. ST 102 A2 · County 003, Massachusetts · Built 1957 · 2 Lanes · 517 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
W220264HFDOTNBI
Year Built
1957
Reconstructed
1997
Length
35.1 m (115.2 ft)
Max Span
16.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
517
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,749,000
Total Project Cost
$4,124,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.