HWY CENTER ST over WATER WILLIAMS RIVER

@ INT OF CNTR ST & RT 102 · County 003, Massachusetts · Built 1992 · 2 Lanes · 2,069 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W2200208LMUNNBI
Year Built
1992
Length
19.5 m (64 ft)
Max Span
18.3 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
2,069
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,340,000
Total Project Cost
$2,011,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.