I 90 WB over WATER WILLIAMS RIVER

AT WEST STOCKBRIDGE A5 · County 003, Massachusetts · Built 1957 · 2 Lanes · 17,712 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
W220194HBDOTNBI
Year Built
1957
Reconstructed
1987
Length
57.5 m (188.6 ft)
Max Span
19.4 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
17,712
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,040,000
Total Project Cost
$1,561,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.