ST106 W CENTER ST over ST 24

.75 MI SO OF WEST ST · County 023, Massachusetts · Built 1954 · 4 Lanes · 17,143 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W180173W1DOTNBI
Year Built
1954
Length
36.9 m (121.1 ft)
Max Span
17.7 m
Width
21.3 m (69.9 ft)
Lanes
4
Daily Traffic
17,143
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,117,000
Total Project Cost
$7,676,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.