ST106 W CENTER ST over WATER HOCKOMOCK RIVER

.5 MI E OF ST 138 · County 023, Massachusetts · Built 2017 · 2 Lanes · 14,857 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
W18012BLMDOTNBI
Year Built
2017
Length
20.9 m (68.6 ft)
Max Span
19.8 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
14,857
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.