ST 67 /ST19/MAIN over RR CSX
AT INT BRIDGE AVE · County 027, Massachusetts · Built 1972 · 2 Lanes · 4,800 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.213275, -72.190578
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 54 years old.
Nearby Bridges
ST 67 MAIN ST over WATER QUABOAG RIVER
Built 1938
HWY OLD W BRKFLD over WATER QUABOAG RIVER
Built 1956
HWY BRIDGE ST over WATER QUABOAG RIVER
Built 1992
HWY BRIDGE ST over RR CSX
Built 1850
ST 67 /ST19/BOSTON over WATER NAULTAUG BROOK
Built 1958
ST 67 /ST19/QUABOA over RR CSX
Built 1959
ST 67 /ST19/WARREN over WATER QUABOAG RIVER
Built 1959
ST 9 W MAIN ST over WATER WICKABOAG LK OTLT
Built 1959
HWY SOUTH ST over COMB QUABOAG R & CSX
Built 1980
I 90 WB over ST 19 BRIMFIELD RD
Built 1957
Bridge Details
- Structure #
- W070071AXDOT634
- Year Built
- 1972
- Length
- 31.2 m (102.4 ft)
- Max Span
- 28 m
- Width
- 17.4 m (57.1 ft)
- Lanes
- 2
- Daily Traffic
- 4,800
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,615,000
- Total Project Cost
- $5,423,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.