HWY SOUTH ST over COMB QUABOAG R & CSX

AT JCT OF ST 67 · County 027, Massachusetts · Built 1980 · 2 Lanes · 3,103 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
W070041AWDOT634
Year Built
1980
Length
91.4 m (299.9 ft)
Max Span
35.4 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
3,103
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,451,000
Total Project Cost
$9,677,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.