ST 9 WEST MAIN ST over WATER MUDDY BROOK

100 E JCT VERNON ST · County 015, Massachusetts · Built 1958 · 2 Lanes · 6,331 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
W050180UXDOTNBI
Year Built
1958
Length
13.4 m (44 ft)
Max Span
13 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
6,331
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,437,000
Total Project Cost
$2,156,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.