HWY SOUTH ST over RR MCRR SPUR

AT JCT BENHAM ST. · County 015, Massachusetts · Built 2000 · 2 Lanes · 6,850 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
W05006AWKDOT634
Year Built
2000
Length
30.6 m (100.4 ft)
Max Span
10.6 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
6,850
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,367,000
Total Project Cost
$3,551,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.