HWY HARDWICK PND over WATER MUDDY BROOK

0.5 MI S. OF HARDWCK LINE · County 015, Massachusetts · Built 2007 · 2 Lanes · 517 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
W050118EJMUNNBI
Year Built
2007
Length
14.2 m (46.6 ft)
Max Span
13.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
517
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$982,000
Total Project Cost
$1,474,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.