HWY MERIAM ST over RR MBTA/BMRR
JUST OFF MAIN ST · County 017, Massachusetts · Built 2001 · 2 Lanes · 1,422 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.489844, -71.06945
This bridge is in worse condition than 9.4% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 25 years old.
Nearby Bridges
HWY COOPER ST over RR MBTA/BMRR
Built 1919
HWY WILEY ST over WATER MILL RIVER
Built 1971
HWY HOPKINS ST over I 95 /ST128
Built 1959
I 95 /ST128 over HWY PARKER RD
Built 1959
I 95 /ST128 over ST 28 MAIN ST
Built 1950
I 95 /ST128 over RR MBTA/BMRR
Built 1950
I 95 /ST128 over HWY NORTH AVE
Built 1950
I 95 /ST128 over HWY PLEASURE ISLAND RD
Built 1948
I 95 /ST128 over WATER SAUGUS RIVER
Built 1940
I 95 /ST128 over RR BMRR/MBTA
Built 1948
Bridge Details
- Structure #
- W01001AL9DOT634
- Year Built
- 2001
- Length
- 14 m (45.9 ft)
- Max Span
- 12.2 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,422
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,891,000
- Total Project Cost
- $4,337,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.