HWY MONTEREY RD over WATER HOP BROOK

.3 MI SOUTH OF MAIN ROAD · County 003, Massachusetts · Built 2021 · 2 Lanes · 325 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
T10007C3BMUNNBI
Year Built
2021
Length
16.9 m (55.4 ft)
Max Span
15.8 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
325
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.