HWY TYRINGHAM RD over WATER LAKE GARFIELD OTLT

@ SYLVAN RD INTERSECTION · County 003, Massachusetts · Built 1972 · 2 Lanes · 517 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
M29006060MUNNBI
Year Built
1972
Length
8.5 m (27.9 ft)
Max Span
2.2 m
Lanes
2
Daily Traffic
517
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$426,000
Total Project Cost
$640,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.