HWY MIDDLBORO AV over RR MBTA/CSX

MP QNB 17.8 · County 005, Massachusetts · Built 2000 · 2 Lanes · 4,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
T01003AGWDOT634
Year Built
2000
Length
50 m (164 ft)
Max Span
19.1 m
Width
14.7 m (48.2 ft)
Lanes
2
Daily Traffic
4,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,034,000
Total Project Cost
$1,552,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.