HWY LINCOLN RD over WATER SUDBURY RIVER

2 MI E OF CONCORD RD · County 017, Massachusetts · Built 1992 · 2 Lanes · 1,551 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
3
Serious
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
S3100124WMUNNBI
Year Built
1992
Length
34.7 m (113.8 ft)
Max Span
4.9 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
1,551
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$5,904,000
Total Project Cost
$8,857,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.