I 91 RAMP C over I 91 & RMP A TO US 5 NB

JCT I-91 · County 013, Massachusetts · Built 1954 · 2 Lanes · 12,790 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
S240430WDDOTNBI
Year Built
1954
Length
62.5 m (205.1 ft)
Max Span
19.4 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
12,790
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,499,000
Total Project Cost
$6,749,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.