US 5 (S END BR) over COMB AMTRAK & CONN RIV

SOUTH END BRIDGE · County 013, Massachusetts · Built 1954 · 4 Lanes · 55,323 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
A050010W6DOTNBI
Year Built
1954
Reconstructed
2006
Length
444.7 m (1459 ft)
Max Span
91.4 m
Width
21.9 m (71.9 ft)
Lanes
4
Daily Traffic
55,323
Material
Steel
Design
Truss - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$63,268,000
Total Project Cost
$94,903,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.