HWY BROOKS PD RD over WATER FIVE MILE RIVER

200 FT. E. N. BRKFLD T.L. · County 027, Massachusetts · Built 2012 · 2 Lanes · 700 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
S230168RFMUNNBI
Year Built
2012
Length
12.8 m (42 ft)
Max Span
12.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
700
Material
Concrete
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$952,000
Total Project Cost
$1,429,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.