ST 31 N SPENCER RD over WATER SEVEN MILE RIVER

1MI. N. OF ST-9 · County 027, Massachusetts · Built 1952 · 2 Lanes · 5,299 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
S230021XWDOTNBI
Year Built
1952
Length
16.3 m (53.5 ft)
Max Span
14.9 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
5,299
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,229,000
Total Project Cost
$1,844,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.