ST 7 A/ASHLEY FLS over RR HRR
1.4 MI N OF CONN SL 51.49 · County 003, Massachusetts · Built 2014 · 2 Lanes · 500 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
42.065, -73.338333
This bridge is in worse condition than 11.8% of bridges in County 003. The average bridge in Massachusetts is 0 years old; this one is 12 years old.
Nearby Bridges
ST 7 A/ASHLEY FLS over WATER HOUSATONIC RIVER
Built 2020
HWY RANNAPO RD over WATER HOUSATONIC RIVER
Built 1971
US 7 S MAIN ST over WATER HOUSATONIC RIVER
Built 1959
ST 7 A/ASHLEY FLS over WATER KONKAPOT RIVER
Built 2005
US 7 S MAIN ST over WATER KONKAPOT RIVER
Built 1959
SR 832 over HOUSATONIC RAILROAD
Built 1938
SR 833(CLAYTON RD) over KONKAPUT RIVER
Built 1988
ALLYNDALE ROAD over KONKAPOT RIVER
Built 1982
HWY CANAAN SFLD over WATER KONKAPOT RIVER
Built 1952
US ROUTE 44 over BLACKBERRY RIVER
Built 1989
Bridge Details
- Structure #
- S10023BDDDOT634
- Year Built
- 2014
- Length
- 33.7 m (110.6 ft)
- Max Span
- 32 m
- Width
- 14.9 m (48.9 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $329,000
- Total Project Cost
- $494,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.