HWY RANNAPO RD over WATER HOUSATONIC RIVER

0.8 MI W. OF ASHLEY FALLS · County 003, Massachusetts · Built 1971 · 2 Lanes · 259 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S10001085MUNNBI
Year Built
1971
Length
46.9 m (153.9 ft)
Max Span
23 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
259
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$3,509,000
Total Project Cost
$5,264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.