HWY HAMILTON ST over WATER SAUGUS RIVER

AT SAUGUS RIVER · County 009, Massachusetts · Built 2003 · 2 Lanes · 9,786 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S050142QPMUNNBI
Year Built
2003
Length
12.8 m (42 ft)
Max Span
11.6 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
9,786
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,236,000
Total Project Cost
$1,855,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.