HWY CENTRAL ST over WATER SAUGUS RIVER

1.1 KM N OF MAIN ST · County 009, Massachusetts · Built 1973 · 2 Lanes · 6,724 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S050042QQMUNNBI
Year Built
1973
Length
12.2 m (40 ft)
Max Span
11.5 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
6,724
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,098,000
Total Project Cost
$1,648,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.