HWY SIBLEY ROAD over WATER PELHAM BROOK

100 YDS E OF ZOAR RD · County 011, Massachusetts · Built 1985 · 1 Lanes · 129 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
R10012BKCMUNNBI
Year Built
1985
Length
9.9 m (32.5 ft)
Max Span
9.3 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
129
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,619,000
Total Project Cost
$2,429,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.