HWY ZOAR RD over WATER SHIPPEE BROOK

1.2 MI EAST OF COUNTY RD · County 011, Massachusetts · Built 1939 · 2 Lanes · 278 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
R100070FDMUNNBI
Year Built
1939
Length
10.2 m (33.5 ft)
Max Span
9.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
278
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$608,000
Total Project Cost
$913,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.