HWY SLPY HLLW RD over RR CSX

0.7 MI E OF ST 41 157.55 · County 003, Massachusetts · Built 2009 · 2 Lanes · 130 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
R060020E4DOT634
Year Built
2009
Length
15.3 m (50.2 ft)
Max Span
14.9 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
130
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,370,000
Total Project Cost
$3,556,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.