US 44 WINTHROP ST over WATER PALMER RIVER

1.7 MI NE SEEKONK T.L. · County 005, Massachusetts · Built 1850 · 2 Lanes · 13,010 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
6
Satisfactory
Superstructure
3
Serious
Substructure
3
Serious

Bridge Details

Structure #
R040013N6DOTNBI
Year Built
1850
Reconstructed
1929
Length
8.5 m (27.9 ft)
Max Span
3.4 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
13,010
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,265,000
Total Project Cost
$3,398,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.