ST114 A/FALL RIVER over I 195

0.5 MI SE R.I. SL · County 005, Massachusetts · Built 2012 · 4 Lanes · 41,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S08011B65DOTNBI
Year Built
2012
Length
92.8 m (304.5 ft)
Max Span
45.7 m
Width
23.7 m (77.8 ft)
Lanes
4
Daily Traffic
41,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,758,000
Total Project Cost
$5,638,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.