HWY GALE AVE over RR CSX

0.3 MI N OF US 20 152.32 · County 003, Massachusetts · Built 1909 · 2 Lanes · 1,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P100190DQDOT634
Year Built
1909
Reconstructed
2001
Length
22.2 m (72.8 ft)
Max Span
21 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
1,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,222,000
Total Project Cost
$3,334,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.