ST 2 over COMB ST2A &MLLRS R & RD

MM 65.3 ON ST 2 · County 011, Massachusetts · Built 1958 · 2 Lanes · 16,422 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
O030250VXDOTNBI
Year Built
1958
Reconstructed
1987
Length
179.7 m (589.6 ft)
Max Span
54.7 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
16,422
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$18,697,000
Total Project Cost
$28,046,000