HWY CHURCH ST over WATER KEYUP BROOK

0.2 MI N OF ST 2 · County 011, Massachusetts · Built 1940 · 2 Lanes · 905 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
E100110PWMUNNBI
Year Built
1940
Length
7.9 m (25.9 ft)
Max Span
6.7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
905
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,883,000
Total Project Cost
$2,825,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.