I 91 NB over ST 9 BRIDGE ST
MM 24.8 ON I-91 NB · County 015, Massachusetts · Built 1965 · 2 Lanes · 23,875 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.333189, -72.621189
This bridge is in worse condition than 32.9% of bridges in County 015. The average bridge in Massachusetts is 0 years old; this one is 61 years old.
Nearby Bridges
I 91 SB over ST 9 BRIDGE ST
Built 1965
I 91 NB over OTHER NORWOTTUCK RA TR
Built 1965
I 91 SB over OTHER NORTWOTTUCK RA TR
Built 1965
ST 9 RUSSELL ST over WATER CONNECTICUT RIVER
Built 1937
I 91 SB over HWY OLD FERRY RD
Built 1965
I 91 NB over HWY OLD FERRY RD
Built 1965
I 91 NB over HWY DAMON RD
Built 1965
I 91 SB over HWY DAMON RD
Built 1965
I 91 SB over COMB I 91 RAMP & GWRR
Built 1963
I 91 NB over COMB I 91 RAMP & GWRR
Built 1963
Bridge Details
- Structure #
- N19062106DOTNBI
- Year Built
- 1965
- Length
- 49.3 m (161.7 ft)
- Max Span
- 15.5 m
- Width
- 13.5 m (44.3 ft)
- Lanes
- 2
- Daily Traffic
- 23,875
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,403,000
- Total Project Cost
- $2,105,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.